Installation And First Power On; Activity - Cino eC Pro Installation And Maintenance Manual

Table of Contents

Advertisement

cino eC PRO by
08.
installation
and
first
power on
08.01. introduction

08.02. activity

MAN1010119 rel. 01 dated 30.01.2014
www.rheavendors.com
after having unpacked the vending machine, arranged it firmly in
the work place and connected hydraulically and electrically, carry
out some actions to operate it;
wash hands thoroughly with water and soap before
handling the machine and the products; only use potable
water to clean the components;
open the door, lift the cover, power on the main switch of the
machine (see 05.08.);
pour a small quantity of coffee beans into the coffee hopper to
avoid displaying the no coffee message; remember to open the
hopper orange blade;
arrange a cup beneath the nozzles, insert and rotate the service
key into the door switch (see 05.13.);
the vending machine is supplied and running to all effects; the
mobile parts of the coffee brewer will be handled; act extremely
carefully;
at the end of assembly and final testing, the water used for testing
is discharged from the machine; at the first power-on at the
station, all circuits must be filled in before any other action; for this
reason, the machine will automatically load water;
the vending machine executes a diagnostic cycle for loading and
heating waters; the warning messages for the progress of these
phases appear on the display;
make sure that the machine is hydraulically supplied and that the
drip tray is inserted; while following the display messages, press
"10" to carry out the first installation;
the display shows:
wait for water to come out of the product nozzles for some
seconds; the flow will automatically stop after dispensing all
necessary water and the display will show:
the pressure boiler water starts heating to achieve the temperature
setpoint (see 09.01.e.);
at the end of this phase, ca. 3 minutes later, the display will show
the standby messages:
tel: 0039 02 966 551
rheavendors group's sole property
attention
attention
fax: 0039 02 96 55 086
e mail: rheavendors@rheavendors.com
no coffee beans
INSTALLATION
Water OK ?
10= START
driptray
inside?
10= START
first install.
starts automat.
switching on......
please wait
refilling water
wait
end installation
autom. reset
wait
temperature
Cino eC PRO
place your
cup
page no. 23 of 52 page

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents