Fujitsu PRIMERGY TX300 S5 Operating Manual page 46

Hide thumbs Also See for PRIMERGY TX300 S5:
Table of Contents

Advertisement

Installing/removing the rack model
– Ensure that the safety mechanisms on the server, e.g. stoppers or retaining
systems, are functioning correctly.
– The shape of the rack support uprights must ensure that the telescopic rails
can be bolted at the front.
– Telescopic rails screwed to the front
The rails have a linear alignment feature to ensure that they can be adjusted
to different rack depths (710 - 785 mm).
– No cable management support (delivered with the mounting kit).
– Climatic conditions
An unobstructed air intake in the rack front and air discharge in the rear
cover of the rack are essential for ventilation of the installed server.
In general, the ventilation concept ensures that the necessary cooling is
achieved by the horizontal self-ventilation of the installed devices (air flow
from the front to the rear).
– Power supply
For installation in 3rd party racks, you must ensure that the appropriate
socket strips are present.
46
Operating manual
Hardware installation
TX300 S5

Advertisement

Table of Contents
loading

Table of Contents