Platinum 4300 TL Installation And Operating Manual page 72

Hide thumbs Also See for 4300 TL:
Table of Contents

Advertisement

PLATINUM Inverter 4300 TL, 4800 TL, 5300 TL, 6300 TL, 7200 TL
Troubleshooting
No.
Operating status
105
Startup:
Polarity of DC connection
reversed
106
Blocking
to
system error
129
130
Connections L and N reversed
131
System error
to
199
Non-blocking errors
201
Amplitude limit for feed phase
exceeded or fallen below
202
exclusively for 3 phase ENS
to
Amplitude limit of phase
204
voltages exceeded or fallen
below
208
System incident on feed phase
(voltage peak)
210
Mains frequency above or
211
below limits
212
Diagnosis support during
to
service
219
220
measured temperatures too
to
high
224
72
Installation and operating manual: PLATINUM Inverter 4300 TL, 4800 TL, 5300 TL, 6300 TL, 7200 TL
Version 05/2010
Mat. No. 734 559-AB
Check DC connection.
Separate inverter from mains.
Restart inverter.
If measure is not successful:
Call Service.
Check connections L and N on AC plug.
Separate inverter from mains.
Restart inverter.
If measure is not successful:
Call Service.
Have voltage amplitude of feed phase checked.
Ensure that all fuses are switched on.
Startup:
Have inverter 3-phase connected.
If error occurs frequently:
Have all bondings and fuses between the consumer's terminal
and the inverter checked.
Have the mains quality checked.
If inverter is running on emergency power (different main
frequency):
No measure required.
Provide the service with the error code if required.
Check ventilation openings.
Measure

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7200 tl4800 tl5300 tl6300 tl

Table of Contents