Compliance With Standards; And Regulations - Buderus Logano G615 Installation And Service Instructions Manual

Low-temperature oil/gas boiler boilers for oil/gas-fired power burners
Table of Contents

Advertisement

2.3
Compliance with standards and
regulations
Installation and operation of the system must comply with
all applicable codes, regulations and statutory
requirements.
Installation, connection of the fuel supply and flue
connector, commissioning, connection of the electrical
power supply, servicing and repair may only be carried out
by a trained and certified heating contractor. Only
registered gas fitters may carry out work on the gas train.
The system must be cleaned and serviced once a year.
The operation of the complete system must be tested at
the same time. Any faults must be corrected immediately.
The design and mode of operation of this boiler comply
with the American National Standard ANSI Z21.13/
CSA4.9, latest edition for Gas Fired Low Pressure Steam
and Hot Water Boilers.
Other confirmed approvals and certifications are
indicated by labels on the boiler.
The heat exchanger has been designed and certified in
accordance with the ASME Boiler and Vessel Code,
Section IV.
Installation of the wall mounted condensing gas boiler
must comply with all applicable codes and regulations
imposed by the national, Federal or local authorities and
bodies. If no specific requirements are defined, in the
USA, the latest edition of the National Fuel Gas Code
ANSI Z223.1/NFPA 54 applies. In Canada, installation
must comply in all respects with the latest edition of the
Installation Code for Gas Burning Appliances and
Equipment, CAN/CSA-B.149 and the applicable local
regulations and requirements for the appliance category.
The relevant authorities and regulatory bodies must be
informed before installation starts.
Logano G615 - Subject to technical modifications
Product description
Where required by local regulations, the system must
comply with the American Society of Mechanical
Engineers Safety Code for Controls and Safety Devices
for Automatically Fired Boilers (ASME CSD-1).
The hot water distribution system must comply with all
applicable codes and regulations. When replacing an
existing boiler, it is important to check the condition of the
entire hot water distribution system to ensure safe
operation.
In the Commonwealth of Massachusetts, this appliance
must be installed by a licensed plumber and gas fitter.
Valves external to the boiler must be fitted with T-handles
and condensate piping must be installed in accordance
with the State Plumbing Code.
2
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents