Figure 12. Switch configuration steps

Providing power to the switch

Follow these steps to power on the switch
1. Connect the power cords to both power supplies
2. Connect the other end of the power cords to power sources. Ensure that the
3. Press the "|" area of both power switches.
4. After POST is complete, verify that the switch power LED on the port side is
Attention: Do not connect the switch to the network until the IP address is set.
20
SAN32B-E4 Installation, Service, and User Guide
Switch Configuration
Connect serial cable
between switch and host
Login to serial console port
Set IP address
Log off serial console port
and disconnect serial cable
Connect Ethernet cable
and open Telnet session
Local
level
Set Domain ID
Set date and time
Verify operation and
back up configuration
Install SFPs and attach cables
Manage cables
DANGER
An electrical outlet that is not correctly wired could place
hazardous voltage on metal parts of the system or the devices that
attach to the system. It is the responsibility of the customer to
ensure that the outlet is correctly wired and grounded to prevent
an electrical shock. (D004)
cords have a minimum service loop of 6 in. available and are routed to avoid
stress.
Note: Power is supplied to the switch as soon as the first power supply is
connected and turned on. To protect against AC failure, connect the
power cords to outlets on separate circuits.
green and the switch status LED on the port side is off.