Kaco Powador 3200 Operating Instructions Manual page 51

Hide thumbs Also See for Powador 3200:
Table of Contents

Advertisement

M a in tenance/Tro u b le s ho ot in g
Authorised electrician
Status
Display
FS
42
Line failure:
overvoltage
L1
FS
48
Line failure:
Underfrequency
FS
49
Line failure:
Overfrequency
FS
50
Line failure:
average voltage
FS
50
Line failure:
overvoltage L1
FS
51
Grid fault (medium)
overvoltage L1
FS
52
Grid fault (medium)
overvoltage L1
FS
53
Grid fault (medium)
overvoltage L2
FS
54
Grid fault (medium)
overvoltage L2
FS
55
Fault
DC link
FS
57
Waiting for
reactivation
FS
58
Control board
overtemperature
FS
59
Self test error
OS 60
Waiting for PV
voltage <550V
OS 61
External
limit (%)
Table 7:
Operating statuses and fault messages on the display
Operating Instructions Powador 3200-6600_EN
Explanation
!
The voltage of a grid phase is too high,
the grid cannot be fed into.
The phase experiencing failure is
displayed.
Grid frequency is too low.
This fault may be grid-related.
Grid frequency is too high.
This fault may be grid-related.
The grid voltage measurement
according to EN 50160 has exceeded
the maximum permitted limit value.
This fault may be grid-related.
String voltage L1 is above the set
maximum permissible string voltage
String voltage L1 is above the set
maximum permissible string voltage
String voltage L1 is below the set
minimum permissible string voltage
String voltage L2 is above the set
maximum permissible string voltage
String voltage L2 is below the set
minimum permissible string voltage
Voltage at the DC link is too high, or
the DC link cannot be charged (IGBT
damage).
Waiting time of the inverter after a
fault.
The temperature inside the unit was
too high. The inverter switches off to
prevent damage to the hardware.
An error occurred during the buff er
inspection.
The inverter does not begin feeding
into the grid until the PV voltage falls
below a specifi ed value.
The external Power Control limit was
activated by the grid operator. The
inverter limits its power.
Action
By
 Notify your
E
authorised
electrician.
 Notify your
E
authorised
electrician.
 Notify your
E
authorised
electrician.
 Notify your
E
authorised
electrician.
 Notify your
E
authorised
electrician.
 Notify your
E
authorised
electrician.
 Notify your
E
authorised
electrician.
 Notify your
E
authorised
electrician.
 Notify your
E
authorised
electrician.
 Notify your
E
authorised
electrician.
Inverter does not
switch on again
until a country-
specifi c time has
elapsed.
 Provide for
E
suffi cient
ventilation.
 Notify your
E
authorised
electrician.
-
-
-
-
Page 51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents