Operating Instructions Powador 3200-6600_EN
Display/
settings
Defi ning total
yield
Interface
Inverter address
S0 interface
Activate priwatt
Set priwatt
Power Boost
Quick start
Action in this menu/meaning
You can set the total yield to any value, for example,
when you have received a replacement unit and want
to continue the recording from the present value.
 Select "yes" to set the total yield.
A selection is possible only if both RS232 and RS485
interfaces are installed.
 The interface is changed by pressing "2".
Every inverter must have a unique address. The
interface is used to communicate with the Powador-
proLog.
 By pressing key "2", the RS485 address can be set
consecutively from 1 to 32.
Selection of pulse rate for the S0 interface
500, 1000 and 2000 pulses/kWh
 Set pulse rate.
Releases the use of the fault signal relay for the
Powador priwatt internal consumption control relay.
1.
Enter the password.
(See Section 8.1.4 on page 37)
2. Confi rm what you have entered using key "1".
3.
Activate or deactivate the home grid-feed function.
NOTE: Activating this option enables the menu item
Set priwatt.
 Defi ne the switch-on power in kW that needs to be
available on an uninterrupted basis for 30 minutes
before the home feed-in is activated.
 Defi ne the switch-on time (operating time of
Powador-priwatt after activation).
NOTE: This menu item is only available if you have
selected the "On" option for the "Activate priwatt"
menu item in the "Settings" menu.
Off ers the option of reducing the frequency of the IGBT
bridge from 17 kHz to 9 kHz to improve effi ciency.
 Power Boost mode is activated by pressing "2".
NOTE: The change may cause operating noise.
Menu item is displayed only when waiting for grid feed
and during ramp-up limiting.
Off ers the option of ramping up the inverter faster for
inspection or testing.
If there is insuffi cient PV array power, the inverter stops
feeding into the grid after a short period of time.