Kaco Powador 3200 Operating Instructions Manual page 5

Hide thumbs Also See for Powador 3200:
Table of Contents

Advertisement

G ener al N o te s
1.2.3
Additional information symbols
NOTE
Useful information and notes
Country-specifi c function
DE
Functions restricted to one or more countries are labelled with country codes in accordance with
ISO 3166-1.
1.2.4
Instructions symbols guide
a) Single step instructions or instructions that can be carried out in any sequence:
Instructions
↻ Prerequisite(s) for the step(s) (optional)
 Carry out the next step.
 (Additional steps, if applicable)
»
Result of the step(s) (optional)
b) Multi-step instructions that must be carried out in a fi xed sequence:
Instructions
↻ Prerequisite(s) for the steps (optional)
1.
Carry out the next step.
2. Carry out the next step.
3.
(Additional steps, if applicable)
»
Result of the steps (optional)
1.2.5
Abbreviations
PV
Photovoltaic
EEG
German Renewable Energies Act
MPP
Maximum power point (point of the current-voltage diagram of a PV generator at which the maximum
amount of power can be drawn)
Colour codes (in accordance with IEC 60757)
BK
Black
BU
Blue
GY
Grey
Operating Instructions Powador 3200-6600_EN
BN
Brown
GNYE
Yellow-green
Page 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents