Installation Check Off List; Lighting Check Off List - Mendota DXV-42 Installation & Operating Instructions Manual

Gas direct vent fireplace with hearthglo sealed combustion system
Table of Contents

Advertisement

The following Check Off Lists must be completed prior to final operation of the Fireplace, or manufac-
turer's warranty and liabilities will be voided:
Co-axial vent rigid pipe, wall vent cap or roof vent cap must be installed by a
Mendota approved person in accordance with instructions. All joints must be se-
cured, "twist-locked" and leak-proof. 2000
pipe joints of all DuraVent pipe sections.
Horizontal or vertical vent cap must be installed "right-side-up" and tightly
sealed to structure per instructions. Vent Caps must be Mendota approved.
Proper exterior and interior clearances for vent systems and locations for wall
vent cap/roof vent cap must be maintained (See pgs. 8-18.)
Carefully check for correct gas pressure, proper size gas lines (see pgs. 6
for gas leaks.
120 V electrical service and gas supply must be installed in accordance with in-
structions and local and national codes.
All items on "Installation Check Off List" (see above) must be completed.
Connect thermostat to terminal panel next to gas valve.
System millivolt readings (see pg. 31) must be taken by a qualified installer.
CAUTION: Pilot flame must register a minimum of 460 millivolts.
Check air shutter opening - 1/8" to 1/4" Nat. gas or 1/2" LP gas (see pg.29).
Carefully follow all Lighting and Log Installation Instructions.
Make certain that burner lights immediately and flame runs promptly around
"curve" in burner and lights entire burner. DO NOT proceed with operation
unless burner cycles "on/off" without delays.
Make certain that the flame is "stable" and does not "lift" off burner. If flame lifts
off burner turn unit off and check that vent pipes are twist-locked and leak proof
and vent cap is "right side up".
DO NOT proceed with operation if flame is "lifting off" burner.
Make certain glass door is in properly closed position and "centered" in firebox
opening (see pg. 19).

INSTALLATION CHECK OFF LIST

LIGHTING CHECK OFF LIST

sealant must be used on the inner
º
2
4
&
7) and

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents