Installation; Prepare Existing Fireplace; Fireplace Air Duct Removal; Combustion Air Venting Options - kozy heat CHASKA CSK-335S Installation And Operaing Instructions

Direct vent gas fireplace insert
Hide thumbs Also See for CHASKA CSK-335S:
Table of Contents

Advertisement

5.0

INSTALLATION

5.1

Prepare Existing Fireplace

Any removed parts must be capable of reinstallation if this insert is ever removed. Removal of rivets or screws is acceptable.
Trim panels or surrounds must not seal ventilation openings in existing fireplace that this appliance is installed in.
The refractory, glass doors, screen rails, screen mesh, and log grates may be removed from existing fireplace before installing
this gas fireplace insert.
The fireplace flue damper can be fully blocked, open, or removed for installation of this gas fireplace insert.
Clean the chimney and inside of the fireplace to prevent a creosote smell from entering the home.
Cutting of any sheet metal parts of the existing fireplace is prohibited, except the metal floor.
If the metal floor is removed, the insert must be placed directly on metal base of metal fireplace. Mechanically attach 'THIS
UNIT HAS BEEN MODIFIED' label at bottom of existing firebox so it will be visible if this gas fireplace insert is removed.
If the factory-built fireplace has no gas access hole(s) provided, an access hole of 1-1/2 in. (37.5 mm) or less may be drilled
through the lower sides or bottom of the firebox in a proper workmanship like manner. The access hole must be plugged with
non-combustible insulation after the gas supply line has been installed.
Run any necessary electrical wiring to insert.
5.2

Fireplace Air Duct Removal

All steps as outlined in 5.1, Prepare Existing Fireplace, must be completed before continuing with this installation.
1. Remove air duct at top of insert, sliding backwards out of channel.
Refer to 5.6, Vent System Connection, for re-attachment of the air duct.
5.3

Combustion Air Venting Options

This appliance must not share, or be connected to, a chimney flue serving any other appliance.
The flow of combustion and ventilation air must not be obstructed.
Follow the instructions provided in this manual for the combustion air venting option required for installation, depending on which
option used.
Full Connection Venting:
Combustion air intake pipe is ran entire chimney length and
connected to termination cap.
ATTENTION
CAUTION
ATTENTION
WARNING
Stub Venting:
Combustion air intake pipe is extended a minimum of 4 ft.
(1.22 m) past damper opening into existing chimney. It is not
connected to termination cap.
9
Figure 5.1, Air Duct Removal

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents