Toshiba RAS-B10GKVP-E Service Manual page 127

Split type heat pump type/cooling onlytype
Hide thumbs Also See for RAS-B10GKVP-E:
Table of Contents

Advertisement

Appendix
4. Cord heater installation work procedure
No.
Photo / Explanatory diagram
Remove each cabinet, inverter assembly, motor base assembly, and partition board assembly.
1
∗ Do not damage the electric parts such as cables, connectors, etc. while this work
1-1
1-2
Side cabinet (L)
1-3
1-4
Upper cabinet
Valve cover
Water-proof
cover
Wiring cover
Front cabinet
Inverter assembly
Side cabinet (R)
Appendix-4
Procedure
Remove the upper cabinet and the valve cover.
Related parts / Screws list
Part name
Screw type
Upper cabinet
Valve cover
Remove the front cabinet, the wiring cover and the
water-proof cover.
Related parts / Screws list
Part name
Screw type
Front cabinet
Wiring cover
Remove the side cabinet (R/L) and the inverter assembly.
Related parts / Screws list
Part name
Screw type
Side cabinet (R)
Side cabinet (L)
Inverter assembly
Remove the inverter assembly.
No.
Part name
Connector No.
1
TE sensor
CN600
2
TD sensor
CN601
3
TO sensor
CN602
4
TS sensor
CN603
5
4-way valve coil
CN701
6
PMV coil
CN700
7
Fan motor
CN300
Compressor
(Intermediate
8
lead
connector)
Reactor
(Intermediate
9
(2 pieces.)
connector)
Used screw
Quantity
Ø4 × 8
5
Ø4 × 1
1
Used screw
Quantity
Ø4 × 8
7
Ø4 × 8
2
Used screw
Quantity
Ø4 × 8
7
Ø4 × 8
3
Ø4 × 8
1
Connector color
White
White
White
White
Yellow
White
White
White
White

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents