Operating the system
Heating the boiler
3.2 Heating the boiler
3.2.1 Switching on the system
8
3.2.2 Heating the boiler
7.1
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen
Tel +43 (0) 7248 606-0
Fax +43 (0) 7248 606-600
Switch on the main switch (8) on the controls
After the system check, the control system is ready for operation
Open the insulated door and the fuel loading door
It is recommended that you do not remove the ash in the
combustion chamber during each heating-up process, to protect the
combustion chamber.
Fill the fuel loading chamber in accordance with the output
Use firewood with a length of approximately 50 cm and arrange it
lengthwise
The flame slot must not be obscured!
After the first layer of pieces of wood lay cardboard on flat
Close the fuel loading door
Open the pre-heating chamber door and ignite the cardboard
If the underpressure from the induced draught fan is too strong for
the firing material to be ignited:
Switch off the induced draught fan using the induced draught
button (7.1)
Ignite the firing material
Press the induced draught button (7.1) again to switch the
induced draught fan on
Leave the pre-heating chamber door open for approximately 5
minutes
A bed of embers forms
Close the pre-heating chamber door and the insulated door
The flue gas temperature must be > 130°C!