Safety

Design Information

2.3 Design Information

2.3.1 Approval and obligation to report

2.3.2 Requirements for central heating water

Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 info@froeling.com www.froeling.com
It is forbidden to carry out modifications to the boiler or to change or
deactivate safety equipment.
Always comply with all fire, building, and electrical regulations when
installing or operating the boiler system, in addition to following the
operating instructions and mandatory regulations that apply in the
country in which the boiler is operated.
Each heating system must be officially authorised.
The appropriate supervisory authority (inspection agency) must always be
informed when installing or modifying a heating system, and authorisation
must be obtained from the building authorities.
Austria:
Inform the civic/municipal building authorities.
Germany:
Register with an approved chimney sweep/the building authorities.
The requirements pertaining to the water used to fill the boiler are
based on the following standards and guidelines:
Applicable standards and guidelines:
Austria:
ÖNORM H 5195-1
Germany:
VDI 2035
Switzerland:
SWKI 97-1
There are no other special requirements for central heating water.
Note on filling with make-up water: bleed the filling hose before
connecting to prevent air from getting into the system.
N O T I C E
2
§
Page 9
B0610008

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S3 Turbo and is the answer not in the manual?

Table of Contents