Replacing Board Bases; Replacing The Mainboard Assembly, Hdd_Extension Board Assembly, Head_Drv Board; Assembly, Pci_Linux Board Assembly And Cooling Fan Assembly - MUTOH Rockhopper II series Maintenance Manual

Hide thumbs Also See for Rockhopper II series:
Table of Contents

Advertisement

4.4. REPLACING BOARD BASES

This chapter explains the procedures for replacing the power source board assembly, mainboard assembly,
PCI_Linux board assembly and cooling fan assembly.
Caution :
When handling circuit boards, do not touch the elements on the board with your bare
hands. Doing so may cause static electricity and break the elements.
4.4.1 Replacing the Mainboard assembly, HDD_Extension board
assembly, HEAD_DRV board assembly, PCI_Linux board assembly
and cooling fan assembly
Notes :
Step 1 :
Remove the 20 screws fixing the Mainboard cover 3.
1 = 2 Screws (M3x6) fixing the Mainboard cover
To replace the board and connect or disconnect the FFC type cable, you should
leave the plug disconnected from the power socket for a while. Otherwise, over-
current could be generated and damage the board.
When changing the main substrate assembly, follow "Parameter backup" to backup
the parameter. Failure to do so could cause the life span counters for the waste
fluid tank and tube not to reset, resulting in an overflow of ink inside the printer.
See "Adjustment" for details of other adjustment.
Remove the following parts before replacing the Mainboard assembly,
HDD_Extension board assembly, HEAD_DRV board assembly, PCI_Linux board
assembly and cooling fan assembly:
Panel unit assembly: "Removing the panel unit assembly"
Hard disk: "User's Guide"
Rockhopper II series printers – Maintenance Manual
2 = Mainboard cover 3
65
AP-74065, Rev. 1.2, 27/09/04

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rockhopper ii 2hRockhopper ii 4h

Table of Contents