JLG 10VP Service And Maintenance Manual page 79

Hide thumbs Also See for 10VP:
Table of Contents

Advertisement

Check voltage on the Red/Blk wire at the MC-1 box, X102 connec-
13.
tor, pin 15, to the Platform Control.
Check for Ground on the BRN wire at the MC-1 box, X102 connector,
14.
pin 1, to the Platform Control.
15.
Check voltage on the Red/Blk wire, pin 9 on the Platform Control
box.
Check for Ground on the BRN wire, pin 8 on the Platform Control
16.
box.
3120728
Table 3-5. No Power At Platform Control.
– JLG Lift –
SECTION 3 - TROUBLESHOOTING
24 volts
Go to Step 14
Ground
Go to Step 15
24 volts
Go to Step 16
Replace Platform
Ground
Control
Replace MC-1
Box
Replace MC-1
Box
Replace Cable
Replace Cable
3-19

Advertisement

Table of Contents
loading

This manual is also suitable for:

15vp20vp

Table of Contents