JLG 10VP Service And Maintenance Manual page 59

Hide thumbs Also See for 10VP:
Table of Contents

Advertisement

AREA ON MACHINE
PLATFORM
Platform Controller (all functions)
Placards and Decals
Control Tags
Electrical Cables
Handrail and Bar Gate
MAST
Mast Chains/Cables/and all component parts
Mast Sections
Mast Sequencing Cables
Speed/PHP Limit Switches
BASE FRAME
Batteries
Battery Charge
Power Cables To Platform
Electric Motor/Hydraulic Pump Unit
Hydraulic Hoses and Fittings
Hydraulic Oil Reservoir *
Hydraulic Oil Reservoir Breather
Manual Descent Valve
Lift Cylinder
Placards and Decals
Wheels and Casters
Wheel Bearings
Electric Drive Wheel Motors
Electric Drive Wheel Gear Box **
Torque Limiting Clutch
Power Switch (Ground Control Box)
Control Tags
Hoses and Cables
Bubble Level Indicator
* Inspection and Maintenance Code 10 to be performed every two years.
** Maintenance Code 10 to be performed only when serviced, requires 6 oz. (175 cc's) to fill.
Inspection and Maintenance Codes:
1. Check for proper and secure installation.
2. Check for visible damage and legibility.
3. Check for proper fluid level.
4. Check for any structural damage; cracked or broken
welds; bent/warped surfaces; broken cable strands.
5. Check for leakage.
6. Check for presence of excessive dirt or foreign
material.
7. Check for proper operation and freedom of move-
ment.
3120728
Table 2-3. Preventive Maintenance & Inspection Schedule.
(10 HRS.)
DAILY
1,11
1,2
1,2
1,8
1,4
1,4,7,9
1,4,7
1,4,7,9
1,7,9
1,3
1
1,8
1
1
3
1,7
1
1,2
1
1,7
1,11
1,2
1,8
1,2
– JLG Lift –
SECTION 2 - SERVICE PROCEDURES
INTERVAL
(50 HRS.)
(200 HRS.)
WEEKLY
MONTHLY
5
5
5
5
4
6,14
5,6,13
4
8,9
8
8. Check for excessive wear or damage.
9. Check for proper tightness and adjustment.
10. Drain, clean and refill.
11. Check for proper operation while pump/motor is
running.
12. Check for proper lubrication.
13. Check for evidence of scratches, nicks or rust and
for straightness of rod.
14. Check for condition of element; replace as neces-
sary.
(500 HRS.)
(1000 HRS.)
3 MONTHS
6 MONTHS
12
12
12
1,6,9
(2000 HRS.)
1 YEAR
2-41

Advertisement

Table of Contents
loading

This manual is also suitable for:

15vp20vp

Table of Contents