Pace MBT250 Operation & Maintenance Manual page 19

Table of Contents

Advertisement

SET-UP
System
Set up the MBT 250 system using Figures 3 through 11 and the following steps.
1. Store the shipping container(s) in a convenient location. These containers can be reused to prevent
damage if you ship or store the system.
2. Place POWER Switch in the "OFF" or "0" position.
3. Position the system on a convenient bench.
Accessories
4. Assemble Tip & Tool Stands . Attach to the power source if desired. Assembly instructions are
enclosed with each Tip & Tool Stand.
5. Using Figure 4 as a guide, install the Tip & Temperature
Selection System Chart Holder to the top of the power
source.
6. Install the Temperature Selection System booklet onto the
Chart Holder.
7. Place handpieces into the Tip & Tool Stands.
8. Connect handpiece connector plug(s) to power
receptacle(s) CH 1, CH 2 and/or CH 3 in the following
manner.
a) With the Connector Key end facing the power source, turn the Locking Ring fully counterclockwise.
b) Orient guide on connector with slot of power receptacle.
c) Insert connector into power receptacle.
d) Turn Locking Ring fully clockwise to lock in place.
Figure 3. Power Off
Figure 4. Chart Holder
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents