fi g. 50
Checking the water pressure
112952.LT.GB.W7H.054
fi g. 51
Checking fl ue pipes
112952.LT.GB.W7H.055
3.1.1
The water pressure should be checked against the commission-
ing entry located on the inside back of this document (min 1 bar).
• If necessary, re-fill system to design pressure and re-set red
pointer to match fill pressure 2 bar.
Check system for leaks if the system needs re-filling more
than 3 times per year.
2 bar
3.1.2
• Check that the flue and air-supply connections and pipes
are sealed and the terminal exit is clear.
44
Remeha Avanta Plus
Checking the water pressure
Checking the flue pipes and air supply pipes for
leaks