Commissioning - REMEHA Avanta Range 24c Installation & Service Manual

Hide thumbs Also See for Avanta Range 24c:
Table of Contents

Advertisement

fi g. 32
Control Panel
LT.AL.W7H.000.036
1 = display
2 = [reset] key
3 = [-] key
4 = [+] key
5 = [enter] key
At the time of commissioning, complete all relevant
sections of the Benchmark Checklist located on the
inside back of this document.
fi g. 33 Benchmark Checklist
T002019
1
2
3
4
5
Remeha Avanta Plus
2.9

Commissioning

2.9.1
Control Panel
The control panel of the Remeha Avanta Plus has 4 function
keys and a LED display. The function keys are used to read
or change the settings and temperatures.
The display has two positions and displays information on the
current operating status of the boiler and any errors.
Numbers, dots and/or letters can appear in the display. The
symbols above the function keys indicate what the function
of that particular key then is.
If no key is pressed for longer than three minutes with the
"boiler in stand-by mode", only one LED is lit. With the "boiler
operating", two LED's are displayed.
• Press any key and the current boiler status and operation
code will appear in the display.
• In the event of a fault, the fault code is displayed instead of
the dots.
2.9.2
Additional guidelines for commissioning
• When commissioning, complete all relevant sections of the
Benchmark Commissioning Checklist, located on the inside
back of this document.
• Work through all the stages of this section, and send a copy
of the completed commissioning details to Broag along with
the completed registration card in the supplied warranty leaflet.
• The boiler is supplied as standard for use with Natural Gas
and tested at an operating pressure of 20 mbar.
The boiler must not be put into operation with a different type
of gas without reference to Par. 2.4.2
2.9.3
Putting the boiler into operation
This section details the procedure for putting the boiler into
operation. There are 7 stages to the procedure:
1. Isolating the power supply and opening the front cover;
2. Checking the connections and making the boiler operational;
3. Switching the boiler on and setting the controls;
4. Checking/setting the gas/air ratio at full load;
5. Checking/setting the gas/air ratio at low load;
6. Making the boiler ready for use;
7. Instructing the user.
1. Isolating the power supply and opening the front cover