Toshiba libretto U100 Maintenance Manual page 193

Personal computer
Hide thumbs Also See for libretto U100:
Table of Contents

Advertisement

3.27 LAN/Modem/Bluetooth/IEEE1394 Test Program
When the test begins, the machine displays BD_ADDR of the DUT. The
progress bar appears when the preparation is completed. The following
message is displayed.
-----------------------------------------------------------------------------
Bluetooth Subsystem T&D for PCSE(CS-Air) VerX.XX
-----------------------------------------------------------------------------
+----------------------+
|
DUT
+----------------------+
Ready>>>>>>>>>>>>>>>>>>>>>>
Insert a floppy disk containing the test program into the tester machine and
turn on the power. When the Bluetooth test menu is displayed on the tester
machine, press T and Enter to select the subtest. The following message will
appear:
-----------------------------------------------------------------------------
Bluetooth Subsystem T&D for PCSE(CS-Air) VerX.XX
-----------------------------------------------------------------------------
+------------------+
|
|
Tester
|
+------------------+
Then press Space to start the Bluetooth communication test.
libretto U100 Maintenance Manual (960-520)
|
BD_ADDR of the DUT = XXXXXXXXXXXXX [h]
<- Progress Bar
[ESC] : Stop
|
|
|
[ESC]:Finish Tester
Is DUT ready?
3 Tests and Diagnostics
Copyright (C) by TOSHIBA Co.
Copyright (C) by TOSHIBA Co.
[SPACE]:Start
[CONFIDENTIAL]
3-75

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents