PELLET VENT TERMINATION:   
Termination must be a minimum of 12" above 
the chase cap (DIM "A) (note: the chimney must 
meet local codes for height above the roof or 
other obstructions) 
Must have an approved cap (B) (to prevent wa‐
ter from entering) or a 45* elbow downturn. 
If the termination is located on the predomi‐
nantly windy side of the house, an approved 
house shield is recommended to prevent soot 
from accumulating on the side of the house. 
Must not be located where snow or other mate‐
rials such as leafs, snow or grass, could block it. 
Must have a "Metal Seal Plate"  or "Wall Thim‐
ble" at point (C) 
Horizontal terminations must protrude 12" from 
the wall, vertical terminations 24" 
Minimum 3' clearance above any forced air in‐
take of any other appliance within 6'. 
Minimum 3' above a gas meter/regulator within 
3' horizontally of the vertical centre line of regulator.   
Minimum 6' clearance to a gas service regulator vent out‐
let. 
Minimum 1' clearance under veranda, porch, deck or bal‐
cony.  Permitted only if structure is fully open on a mini‐
mum of two sides beneath the floor. 
VS0952_E 
E
 S
XHAUST
YSTEM
12/30/2009 
 
 (C
)
ONTINUED
 12 

Advertisement

Table of Contents
loading

This manual is also suitable for:

HiawathaNokomis

Table of Contents