Leak Test - FireplaceXtrordinair 21 DV Manual

Built-in direct vent fireplace
Hide thumbs Also See for 21 DV:
Table of Contents

Advertisement

3 0
3
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be
detected once it enters the firebox, ensuring gas does not build up.
4
Replace the glass.
5
Install the faceplate following directions below.
PLATED SURFACES:
Make sure the plated surfaces are clean before
starting the fireplace. Any marks left on plated
surfaces may become etched in place. Clean
plated surfaces with denatured alcohol and a soft
cloth.
ACID WASH WARNING : Before installing the faceplate, make sure any masonry that has been
treated with acid wash has been properly neutralized (this is used primarily with brick faces). Acid wash
(muriatic acid) is used to remove excess mortar. If not properly neutralized with an ammonia solution,
the gold face may develop a permanent tarnish when the acid evaporates over time. Contact your
dealer if uncertain your facing has been properly neutralized.
6
Turn on the gas to the fireplace. Turn on gas to the heater. Leak test all gas joints prior to starting the
appliance. Start the pilot. Start the main burner. Leak test all gas joints again.
Travis Industries
Finalizing the Installation
Lift and rotate the face forward
until the top brackets lock into the
upper slots.
4030612
b
a
Tilt the face back and insert the
bottom brackets into the lower
slots until they lock in place.
1 0 0 - 0 1 1 4 3

Advertisement

Table of Contents
loading

Table of Contents