Seagull Models SUPER TUCANO Instruction Manual page 24

Artf
Table of Contents

Advertisement

.
SUPER TUCANO
4) When you are sure that everything is
aligned correctly, mix up a generous amount of
Flash 30 Minute Epoxy. Apply a thin layer to the
mounting slot and to bottom of the vertical sta-
bilizer mounting area. Apply epoxy to the bot-
tom and top edges of the filler block and to the
lower hinge also. Set the stabilizer in place
and realign. Double check all of your measure-
ments once more before the epoxy cures. Hold
the stabilizer in place with T-pins or masking
tape and remove any excess epoxy using a
paper towel and rubbing alcohol. Allow the ep-
oxy to fully cure before proceeding.
C/A glue.
Hinge.
24
ELEVATOR - RUDDER PUSHROD HORN
the same method as with the aileron control
horns.
Epoxy.
the both side of elevator.
to each elevator control rod. Thread the horns
on until they are flush with the ends of the con-
trol rods.
as pictures below.
Instruction Manual.
INSTALLATION.
1) Install the elevator control horn using
2) Position the elevator control horn on
Elevator control horn.
Rudder control horn.
Elevator control horn.
3) Thread one clevis and M2 lock nut on
4) Elevator and rudder pushrods assembly
678mm.
Cut.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents