RAIS Q­-BIC Instructions Manual page 13

Q­-bic; q-bic insert
Table of Contents

Advertisement

Assemble the top plate with the self tapping screws. 
For a solid wall installation: 
The outermost part of the upper covering 
should be broken off before it is assembled 
with the two self tapping screws. 
The top plate is not used. 
N.B. 
A 30 degree bend must always be used for a 
brick wall. 
The legs are fixed onto the box and then 
the box can be placed into position. 
For a stud wall installation, all three legs 
are used. 
For a solid wall installation, only the back 
leg is used.

Advertisement

Table of Contents
loading

This manual is also suitable for:

PaloPilarQ­bic insert

Table of Contents