Bracket Unit; Checking The Power Trim And Tilt Operation; Checking The Hydro Tilt Unit Operation - SELVA MARINE Dorado 50 EFI Service Manual

Table of Contents

Advertisement

CHK
ADJ
5. Adjust the position of the shift cable joint
until its hole is aligned with the set pin.
WARNING
The shift cable joint must be screwed in a
minimum of 8.0 mm (0.31 in) c.
6. Connect the cable joint, install the clip,
and then tighten the locknut.
7. Check the gear shift for smooth operation
and, if necessary, repeat steps 3–6.

Bracket unit

Checking the power trim and tilt
operation
1. Fully tilt the outboard motor up and down
a few times and check the entire trim and
tilt range for smooth operation. Check the
power trim and tilt fluid level if necessary.
3-13
Periodic checks and adjustments
c
S69J3370
NOTE:
Be sure to listen to the winding sound of the
power trim and tilt motor for smooth opera-
tion.
2. Fully tilt the outboard motor up, and then
support it with the tilt stop lever 1 to
check the lock mechanism of the lever.
1
Checking the hydro tilt unit
operation
1. Fully tilt the outboard motor up and down
a few times and check the entire tilt
3
range for smooth operation. Replace the
hydro tilt unit if necessary.
2. Fully tilt the outboard motor up, and then
support it with the tilt stop lever 1 to
check the lock mechanism of the lever.
3. Fully tilt the outboard motor up, and then
lock the tilt stop lever 2 to check the lock
mechanism of the hydro tilt unit. Replace
the hydro tilt unit if necessary.
S6C13300
6C13G11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dorado 60 efi

Table of Contents