Blower Cord Location & Snap Disc; Blower Control Box Operations - Quadra-Fire 4100I-GD-B User Manual

4100-i act wood insert
Hide thumbs Also See for 4100I-GD-B:
Table of Contents

Advertisement

R
Blower Cord Location & Blower
Control Box With Switch
This insert comes standard with a blower, installed at the
factory with blower cord on right side of insert (as you face
the unit). The blower cord can also be installed on the left
side. Disconnect the cord from right side. ROUTE WIRES IN
FRONT OF FAN. Re-install on the left side. Do not route cord
behind the cooling fan.
Figure 19.1
Black
Snap Disc
Black
Figure 19.2 - Right Side Location
Figure 19.3 - Left Side Location
April 19, 2010
Red
White
Blower Control
Box with Switch
Cooling Fan
Black
Snap Disc
Cooling Fan
Operating the Blower Control Box with
1. The blower will turn on/off automatically when set to
AUTO.
2. When set to MANUAL, the fan will turn on/off only when
you turn it on or off. This setting over-rides the internal
snap disc.
. Adjust the speed of the fan by turning the HIGH/LOW
knob to the desired setting.
A UTO: Fan will
turn ON/OFF
automatically and
is controlled by the
internal Snap Disc
Figure 19.4
Red
White
250-7201F
4100-I ACT Wood Insert
Snap Disc
MANUAL: Over-rides
MANUAL
the internal Snap Disc
FAN
AUTO
LOW
HIGH
OFF
Page 19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4100i-nl-b4100-i act

Table of Contents