Toshiba QOSMIO G20 Maintenance Manual page 434

Hide thumbs Also See for QOSMIO G20:
Table of Contents

Advertisement

J.3Operation of Independent utility
6. When completing the rebuild, press "OK" to return to the main menu of
Independent Setup Utility.
7. When "Rebuild Limit" is set and [Rebuild Range] is set to [Whole], only [Finish]
is can be selected after exceeding the Rebuild Limit. When [Finish] is selected and
"OK" is selected in [Confirmation], the rebuilding is completed at the time. When
OS is booted after exceeding the Rebuild Limit, the rebuild is completed.
When completing the rebuild, press "OK" to return to the main menu of Independent
Setup Utility.
J-18
[CONFIDENTIAL]
Appendix J Maintenance of TOSHIBA RAID
QOSMIO G20 Maintenance Manual (960-511)

Advertisement

Table of Contents
loading

Table of Contents