C O N C R E T E PA D A N D G AT E A R M AT TA C H M E N T
Red Head Fastener
1/2" x 3 1/2"
Above
6"
Ground
Below
30"
Ground
Important:
DO NOT weld any supports
to the chassis. It must be
allowed to "flex" during
operation.
Post
10
28"
25"
10"
Concrete Pad
Sample Installation
3 7/8"
14"
Approximate Placement of Conduit
Concrete Pad
24"
Out
In
Long Arm
Top View
19"
5 1/4"
3 5/8"
5 1/4"
Hinge
Center
46"
2"
14"
35.5"
29.5"
Short Arm
24"
28"