Leisure Time 5007 User Manual page 44

Table of Contents

Advertisement

G4
C2
STEP 9
Using the pre-drilled holes in the G4 Club House Wall Rail as a guide, drill
thru the Wall Boards using a 3/8" drill bit. Install four 5/16" Spiked T Nuts,
from the inside of the Tower, into these holes.
Turn over the Swing Beam Assembly, stand it up, and line up the holes in
the Y16 Swing Beam Mount to the holes in the G4 Club House Wall Rail.
Attach the Swing Beam Assembly to the Tower using four 2" Hex Bolts,
Lock Washers and Flat Washers through the Y16 Swing Beam Mount and
G4 Rail. Tighten securely, but do not over tighten.
STEP 10
Metal stake installation: measure in 8" from outside edge
of G1 ground board for ground for stake location. Now
attach the stakes to G1 Ground Board using 1" Phillips
Truss Head Bolt, two Flat Washers, Lock Washer and
Barrel Nut Per Diagram at right. You will need a long
screwdriver for leverage. In some cases you may need
to dig a hole to install stake and cement.
Hang the Swings and Trapeze with this simple procedure:
• Put all the chains on the Carabiners Y5.
• Hang the Swings and Trapeze as shown below
• Slip the Plastic Safety Tubes Y6 on the Carabiner.
M5
H6
STEP 11
C2
Y6
Y5
5/16" x 2" HEX HEAD BOLT
FLAT
FLAT
WASHER
WASHER
BOLT
WASHER
5/16"
BARREL
NUT
LOCK

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5037

Table of Contents