Leisure Time 5007 User Manual page 21

Table of Contents

Advertisement

G2 Arched Wall Rail * 4 Holes * 2 Req
1 x 5-1/2 x 57-1/2 [ 2.54 x 13.97 x 146.05 ]
C1
C3
C3
G6
G1
C2
C2
C2
Next Generation 5007 061206
C1
G1
G3
G7
BOLT
G1
G3
L1
G2
G2
C1
C1
H3
Y41
METAL STAKES
C2
G5
FLAT
FLAT
WASHER
WASHER
5/16"
BARREL
NUT
LOCK
WASHER
Metal Stake
G1
C2
G5
Page 20
L1 Floor Board * 4 Holes * 4 Req
11/16 x 4-1/2 x 39 [ 1.74 x 11.43 x 99.06 ]
STEP 21
Now is the time to position unit in
permanent spot. Secure the playset to
the ground by using the stakes in the
locations shown by the black circles.
Metal stake installation: Measure in 8"
from inside post and mark ground for
stake location. Now remove G5 and G6
base board to allow room to twist stake
into ground. You will need a long
screwdriver for leverage. In some cases
you may need to dig a hole to install stake
and cement. Now reattach the G5 and
G6 baseboards to the unit
Use hole in stake as guide to drill 3/8"
pilot hole thru base board use 1" phillips
truss head bolt, 5/16" flat washer thru
stake into baseboard 5/16" flat washer,
5/16" lock washer on barrel nut attach to
base board.
Attach another L1, four-hole Floor Board,
on bottom deck area between C2 Post
flush to outside of Left Baseboard using
2" Wood Screws.
5/16 X 3-3/4"
HEX
HEAD
BOLT
STEP 22
Drive 5/16" Spike T-Nuts into inside of C2 and
C1 Posts. Then attach G2 Sculptured Rails
to front and back of C2 and C1 Posts using
5/16 x 3-3/4" Hex Bolts, Internal Tooth Lock
Washers and Flat Washers.
5/16" FLAT
WASHER
5/16"
SPIKE TEE
NUT
5/16"
INTERNAL
TOOTH
LOCK
#8 X 2
"
WASHER
WOOD
SCREW
© Copyright Playground Inc

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5037

Table of Contents