Leisure Time 5007 User Manual page 42

Table of Contents

Advertisement

(G1 ) Beam Ground Board * 4 Holes * 1 x 5-1/2 x 89
( E2 ) Beam End Support * 4 Hole * 1-1/2 x 3-1/2 x 40-3/4
STEP 5
Pilot drill with 3/16" bit using holes in
G1 as guide and attach the G1 Beam
Ground Board to the assembly using
four 2" Lag Screws, Lock Washers
and Washers. The Ground Board will
overhang the E1 boards, as shown in
the inset illustration. Tighten securely,
but do not over tighten.
NOTE HOW THE
ANGLED FACE OF
B1 IS FACING UP
FOR THESE TWO
STEPS.
5/16 X 3"
5/16 X 2-1/2"
LAG
LAG
SCREW
SCREW
E1
3"
2½"
E1
E2
G1
INTERNAL
5/16 X 2"
LAG
WASHER
SCREW
2½"
STEP 6
Pilot drill using 3/16" bit and holes in
E2 as guide and attach the E2 Beam
End Support E2 to the assembly
using two 3" Lag Screws, Lock
Washers and Washers in the center
E1
holes into B1 and two 2-1/2" Lag
Screws, Lock Washers and Washers
into the E1 boards. Tighten securely,
but do not over tighten.
B1
E1
E1
5/16"
5/16"
TOOTH
FLAT
LOCK
WASHER
© Copyright Playground Inc

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5037

Table of Contents