Leisure Time 5007 User Manual page 29

Table of Contents

Advertisement

H11 Wall Rail * 4 Holes * 2 Req
1 x 3-1/2 x 25 [ 2.54 x 8.89 x 63.50 ]
H11
C3
H11
H11
M9
M9
M9
C3
H11
24"
Next Generation 5007 061206
M1 Wall Rail * 4 Holes * 2 Req
11/16 x 3-3/8 x 57-1/2 [ 1.74 x 8.57 x 146.05 ]
C1
C1
C2
M1
M1
Step 41
Attach H11 Wall Rails, noting countersunk
holes drilled at 2-1/2" from edge go towards C3
Posts. Flush H11 to outside of H9 Front Wall
Rail at top and bottom pilot drill with 3/16" bit
using holes in H11 as guides and fasten using
2-1/2" Lag Screws, Internal Tooth Lock
Washers and Flat Washers. Now level H11's
and fasten to C1 Posts using 2-1/2" Lag
Screws, Internal Tooth Lock Washers and Flat
Washers.
STEP 42
Attach three M9 Wall
Boards to inside of H11
Wall Rails on backside of
Lower Deck using 1-1/2"
Wood Screws spacing
approximately 2" apart.
C1
Page 28
M9 Wall Board * 4 Holes * 23 Req
11/16 x 3-3/8 x 23 [ 1.74 x 8.57 x 58.42 ]
5/16" FLAT
WASHER
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16 X 2-1/2"
LAG
SCREW
STEP 43
Attach M1 Bottom Wall Rail to C2
and C1 Posts flushing M1 to outside
of C2 Posts. Measure up 3-1/2" from
G1 Baseboard at front of Set and
mark C2 and C1 Posts. Attach M1
with mark to bottom of Rail using 2"
Wood Screws. Now measure up 24"
from G1 Baseboard and mark Post
again. Place bottom of M1 Rail with
mark and attach to C2 and C1 Posts
using 2" Wood Screws.
#8 X 1-1/2
"
WOOD
SCREW
#8 X 2
"
WOOD
SCREW
© Copyright Playground Inc

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5037

Table of Contents