Leisure Time 5007 User Manual page 25

Table of Contents

Advertisement

H1 Roof Support * 4 Holes * 2 Req
1 x 3-1/2 x 59-1/2 [ 2.54 x 8.89 x 151.13 ]
C2
STEP 30
Attach H5 Roof Support, four-hole, centering countersink holes in H5 to C2
Posts on left side of Tower. H5 will sit on top of G4 Clubhouse Rail, pilot drill
with 3/16" bit using holes in H5 as guides, and fasten with 2-1/2" Lag Screws,
Internal Tooth Lock Washers and Flat Washers.
C1
STEP 31
Now attach opposite H5 to C1 Post, again centering countersinks in Post. The
bottom of H5 will be flush with Top of Front and Back G2 Sculptured Rails,
again pilot drill with 3/16" bit and fasten with 2-1/2" Lag Screws, Internal Tooth
Lock Washers and Flat Washers.
G2
C2
C2
Next Generation 5007 061206
H5
G4
H5
H5
G4
H1
G2
H1
C1
G8
H5 Roof Support * 4 Holes * 2 Req
1 x 3-1/2 x 57 [ 2.54 x 8.89 x 144.78 ]
C2
G2
G2
C1
STEP 32
Attach H1 Roof Supports flush with
outside of H5s, Front and Back of
Tower Structure and fasten with 2"
Wood Screws.
C1
Page 24
5/16" FLAT
WASHER
5/16"
INTERNAL
TOOTH
#8 X 2
LOCK
WOOD
WASHER
SCREW
5/16 X 2-1/2"
LAG
SCREW
© Copyright Playground Inc
"

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5037

Table of Contents