Leisure Time 5007 User Manual page 13

Table of Contents

Advertisement

C1 - TOWER LEG
C2 - TOWER LEG
C3 - TOWER LEG
*
5"
STEP 1
Start by laying C2, C1 and C3 Posts flat
on ground. Install 5/16" Spike T-Nuts in
the double holes that are towards the
bottom of posts. Then flip posts over so
that the T-Nuts are towards the ground.
Then place H3 Floor Rail, five-hole board,
on C2 and C1 Post. Note: The single
hole in the H3 Rail is towards C2, and
then attach using 5/16x3-3/4"HEX
BOLTS, Internal Tooth Lock Washers and
Flat Washers.
C3
STEP 3
Lay opposite Posts C2, C1 and C3 as before in Step 1
and Step 2, and place 5/16" Spike T-Nuts in posts and
attach H3, again noting single hole toward C2 Post,
using 5/16 x 3-3/4" Hex Bolt, Internal Tooth Lock
Washers and Flat Washers
Next Generation 5007 061206
H13
C1
H3 Floor Rail * 5 Holes * 2 Req
1 x 3-1/2 x 57-1/2 [ 2.54 x 8.89 x 146.05 ]
Single Hole
H3
STEP 4
Attach H13 Floor Rail, five-hole, to C1 and C3
Posts using 5/16 x 3-3/4" Hex Bolts, Internal
Tooth Lock Washers , Flat Washers and Spike
T Nut.
Page 12
H12 Floor Rail * 7 Holes * 1 Req
1 x 3-1/2 x 24 [ 2.54 x 8.89 x 60.96 ]
H13 Floor Rail * 5 Holes * 1 Req
1 x 3-1/2 x 24 [ 2.54 x 8.89 x 60.96 ]
Note Flush Bottom of Posts
STEP 2
Install H12 Floor Rail, seven-
hole, to C1 and C3 Posts using
5/16 x 3-3/4" Hex Bolts, Internal
Tooth Lock Washers and Flat
Washers. Note: center hole at
5" towards C1 Post *
5/16"
SPIKE TEE
NUT
5/16 X 3-3/4"
HEX
HEAD
BOLT
Single Hole
C2
Note Flush Bottom of Posts
5/16" FLAT
WASHER
5/16"
INTERNAL
TOOTH
LOCK
WASHER
© Copyright Playground Inc

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5037

Table of Contents