Leisure Time 5007 User Manual page 30

Table of Contents

Advertisement

M4 Wall Rail * 4 Holes * 2 Req
11/16 x 3-3/8 x 45-3/4 [ 1.74 x 8.57 x 116.21 ]
C2
Flush with
C2 Post
C2
M9
M9
G5
Next Generation 5007 061206
H6
M4
M4
G5
H6
M4
M9
M9
M9
M9
M4
C2
Flush with
M1 Wall Rail
STEP 45
Attach six M9 Wall Boards to inside of M4 Wall
Rails approximately 2-3/4" apart using 1-1/4"
Wood Screws.
C2
Page 29
M9 Wall Board * 4 Holes * 23 Req
11/16 x 3-3/8 x 23 [ 1.74 x 8.57 x 58.42 ]
STEP 44
Attach M4 Wall Rails, noting pre-
drilled holes in M4 Rail at 1-1/2"
from edge towards C2 Post at
backside of Set. Flush M4 to
outside of M1 Wall Rails and fasten
to C2 Post using 2" Wood Screws.
Now level across to the other C2
Post and attach there with 2" Wood
Screws.
#8 X 1-1/4
WOOD
#8 X 2
"
SCREW
WOOD
SCREW
"
© Copyright Playground Inc

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5037

Table of Contents