Installation; Work Rules; Rigging And Placing The Dryer - AEC AD Series Operation And Installation Manual

Ad series dehumidifying dryers
Table of Contents

Advertisement

Installation

4-1

Work Rules

4-2

Rigging and Placing the Dryer

AD Series Dehumidifying Dryers
The installation, operation, and maintenance of this equipment
must be conducted in accordance with all applicable work and
safety codes for the installation location. This may include, but is
not limited to, OSHA, NEC, CSA, and any other local, national,
and international regulations.
• Read and follow these operating instructions when installing,
operating, and maintaining this equipment. If the instructions
become damaged or unreadable, you can obtain additional
copies from AEC.
• Only qualified personnel familiar with this equipment should
work on or with this dryer.
• Work with approved tools and devices.
• Disconnect the electricity before maintenance or service. If
the dryer is installed with a power cord that can be
unplugged, unplug it. If the dryer is permanently wired to a
power main, you must install a fused power disconnect to
allow the disconnect to be locked in the OFF position. Open
and lock out the disconnect installed in the control enclosure.
Take care when rigging and placing the dryer. Figures 4A, 4B, and
4C on the following pages show a suggested safe rigging diagram.
It lets you lift the dryer/hopper unit vertically for installation on the
machine throat. Adjust chain lengths at the center sling bracket
before you lift the unit. Your dryer has built-in lifting lugs.
4
Page 25