Functional Verification Procedure; System/Power - Welch Allyn 53 Service Manual

300 series vital signs monitor
Table of Contents

Advertisement

Functional Verification
Functional Verification Procedure

System/Power

Setup
• If the monitor is configured with the temperature option, connect the temperature probe
and insert it into the probe well.
• If you are using the optional Welch Allyn Model 9600 Calibration Tester (01800-200), plug
it in and set it to 96.4° F (35.8° C).
• If the monitor is configured with the SpO
Battery Charge and Beeper
1. Disconnect the power adapter from the monitor.
2. Verify that the charge LED
3. Connect the power adapter. The monitor emits a single beep tone.
4. Verify that the charge LED
Depending on the charge level of the battery, the charge LED may be either
flashing or steady.
flashing indicates that the monitor is running on AC, the battery is
charging, and the battery is charged to less than 90% capacity.
steady indicates that the monitor is running on AC, the battery may or
may not be charging, and the battery is charged to at least 90% capacity.
Battery Substitution Cable Setup
1. Disconnect the power adapter.
2. Remove the battery cover and remove and disconnect the battery.
3. Separate the connector pair (660-0237-00). Use the end that is identical to the connector
on the battery as a battery substitution test cable.
4. Connect the open-ended red (+) and black (-) wires of this cable to the variable DC power
supply.
5. Set the power supply to 6.0 V ± 50 mV.
6. Connect the test power cable to the battery connector on the monitor.
Vital Signs Monitor Series 300
option, connect the SpO
2
is off.
is on.
19
Functional Verification Procedure
sensor.
2
Service Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents