Raleigh ebike User Manual page 30

Table of Contents

Advertisement

Installing the shifting cable with hub gears
› Bring the cable around to the cassette joint pulley,
hold so that the inner cable fixing nut is facing to
the outside (toward the dropout), and then slide
the flats part of the inner cable fixing washer into
the gap in the pulley.
Flats part of the inner
cable fixing washer
Inner cable
fixing nut
› Turn the cable 60° anticlockwise and attach it on
the hook.
Hook
Turn the
cable 60°
Gap in pulley
Pulley
CJ-8S20
JAPAN
CJ-8S20
JAPAN
› Attach the inner cable to the pulley as shown in the
illustration, pass the inner cable through the slit in
the cassette joint bracket, and then insert the end
of the outer casing securely into the outer casing
holder.
Inner cable
Pulley
Bracket
Bracket
Outer casing holder
C J
- 8 S
2 0
J A
P A
N
Slit
1
1 Pass through the slit
2 Insert into the outer casing holder
› If first inserting the outer casing into the outer
casing holder is easier, then first insert the outer
casing into the outer casing holder, and the insert a
2 mm Allen key or a # 14 spoke into the hole in the
cassette joint pulley, and then turn the pulley so
that the inner cable fixing bolt unit fits into the gap
in the pulley.
3
2
Hole in pulley
2 mm Allen key
or # 14 spoke
1 Insert into the outer casing holder
2 Turn the pulley
3 Insert the inner cable fixing bolt unit
I General User Manual
2
1
CJ-8S20
JAPAN
29

Advertisement

Chapters

Table of Contents
loading

Table of Contents