Electrical Set-Up; Control Box Installation - Centurion Vector2 Installation Manual

Gate opener vector2
Hide thumbs Also See for Vector2:
Table of Contents

Advertisement

Electrical Set-up

Electrical Set-up
WARNING
1. Always check that the isolator in the mains supply to the gate is in the OFF position, before doing any
work.
2. Ensure that all low voltage systems (Less than 42.4V) are suitably protected from damage, by
disconnecting all sources of power such as chargers and batteries before doing any work.
3. All electrical work must be carried out according to the requirements of all applicable local electrical
codes. (It is recommended that a licensed electrical contractor perform such work.)
Secure control box to wall
1. Secure the control box to wall using the most
appropriate means.
Be sure to position the wall box so as not to
cause any hazards during and after the
installation.
Preferably mount the wall box:
• Out of direct sunlight.
• At a comfortable working height.
• Away from garden sprinklers etc.
• To allow easy access even when the
gate is open.
Connect all wiring
2. Connect all the cables as required to the
control card. See page 46 and page 47.
3. When wiring each operator back to the
controller housing, it is recommended to
mount a small junction box adjacent each
operator. Terminate the cable provided on the
operator into this junction box and then route a
new cable from the junction box to the
controller housing.
Step 1
For wiring diagram see page 46/47
Page 26
Wiring Diagram for Basic Operation
Wiring Diagram for Basic Operation
THIN PURPLE
S Sens1
S Sens1
THIN BLUE or ORANGE
S Sens2
S Sens2
THIN PURPLE
PURPLE
PURPLE
S Sens1
M Sens1
M Sens1
MASTER
BLUE
BLUE
S Sens2
THIN BLUE or ORANGE
PURPLE
PURPLE
M Sense2
PURPLE
PURPLE
M Sens1
M Sense2
THIN RED or GREY
Sens+
BLUE
BLUE
M Sense2
THIN RED or GREY
Sens+
BLUE
BLUE
THIN BLACK
Sens-
RED
RED
Sens+
THIN BLACK
Sens-
RED
RED
BLACK
BLACK
Sens-
Saf CLO
Saf CLO
Saf CLO
BLACK
BLACK
Saf OPE
Saf OPE
Saf OPE
Com
Com
Com
LCK/STP
LCK/STP
LCK/STP
TRG
TRG
PED
TRG
PED
Com
PED
Com
FRX
Com
LI T
FRX
FRX
LED
LI T
LI T
Com
LED
Aux 12V
LED
Com
Com Saf
Com
Aux 12V
Sol
Aux 12V
Li g ht
15
15
Com Saf
Com Saf
SLAVE
Li g ht
15
15
Sol
Sol
PURPLE
PURPLE
Batt +
Li g ht
Li g ht
BLUE
BLUE
Bat -
MTR M+
Li g ht
Li g ht
RED
RED
MTR —
Batt +
Batt +
BLACK
BLACK
MTR S+
Bat -
MTR S-
Bat -
THICK BLUE
MTR M+
MTR M+
THICK BLACK
MTR —
MTR —
MTR S+
THICK BLUE
MTR S+
MTR S-
THICK BLACK
MTR S-
Figure 15 Wiring Diagram
Figure 15 Wiring Diagram
Page 36
Page 36
Page 37
Page 37
JUNCTION
BOX

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vector2 v400Vector2 v500

Table of Contents