9

mountInG tHE boILER

Due care should be taken
when lifting the boilers, with
respect to their weights, see
Table 2 on Page 2. Also refer
to Safe Handling on Page 4.
1. Lift the boiler onto the wall
mounting plate as shown.
Note: It is not necessary to
hold the boiler at an angle
to engage the wall mounting
plate.
2. Using the remaining coach
screws, secure the bottom of
the boiler to the wall through
the attached brackets.
10 VEntILAtIon
The ventilation requirements of these boilers is dependant on
the type of flue system used, and their heat input. All vents
must be permanent with no means of closing, and positioned
to avoid accidental obstruction by blocking or flooding.
EVOMAX 30/30P, 40/40P, 60/60P
Detail reference should be made to BS. 5440 Pt. 2. In IE refer
to the current edition of I.S. 813.
The following notes are for general guidance only:
If installed as a room sealed appliance in a room or internal
space, then no purpose provided ventilation is required.
If installed as an open flued appliance in a room or internal
space then a permanent air vent is required. The sizes given
below are for vents directly communicating with outside air.
For other situations refer to BS. 5440 Pt. 2. In IE refer to the
current edition of I.S. 813.
boiler Size
30 & 30P
Minimum vent free
area (cm
)
2
If installed in a compartment, then permanent air vents are
required at high and low level. These vents may communicate
direct to outside air, or to a room/internal space. If to a room/
internal space, it must itself be adequately ventilated as
above.
Evomax Ventilation Requirements (not exceeding 70kW net Input) when installed in a compartment
Room Sealed Application - min. Vent free Area (cm
To a room or internal space
Boiler Size
30
High Level
310
410
Low level
310
410
The temperature within the boiler room shall not exceed 25ºC within 100mm of the floor, 32ºC at mid height and 40ºC within 100mm
of the ceiling.
12
InStALLAtIon
40 & 40P
60 & 60P
117
167
269
To outside Air
40
60
30
610
155
610
155
1
Evomax 80, 80P, 100, 120, 150 and multiple boiler
applications
Detail reference should be made to BS. 6644 for inputs
between 70kW and 1.8MW (net). In IE refer to the current
edition of I.S.820. The following notes are for general
guidance only:
If ventilation is to be provided by means of permanent
high and low vents communicating direct with outside air,
then reference can be made to the sizes below. For other
ventilation options refer to BS. 6644. In IE refer to the current
edition of I.S.820.
EVomAX 80, 80P, 100, 120 & 150
open flued Installations
Required area (cm
Low level (inlet)
High level (outlet)
Note: Where a boiler installation is to operate in summer
months (e.g. DHW) additional ventilation requirements
are stated, if operating for more than 50% of time (refer
to BS6644).
Room Sealed Installations
A minimum of 2cm
both high and low level is required for boiler rooms. For
enclosures refer to BS6644.
2
)
open flue Application - min. Vent free Area (cm
To a room or internal space
40
60
30
205
305
310
205
305
620
2
206210-10388
) per kW of total rated input (net)
2
Boiler room
4
2
free area per kW of net heat input at
2
To Outside Air
40
60
30
410
610
155
820
1220
310
EVOMAX -
Installation & Servicing
Enclosure
10
5
2
)
40
60
205
305
410
610