IDEAL Evomax 30 Installation & Servicing Manual page 23

Evomax condensing boilers
Hide thumbs Also See for Evomax 30:
Table of Contents

Advertisement

28 ConDEnSAtE PIPE tERmInAtIon ConfIGuRAtIonS
Notes: ALL EXTERNAL PIPE RUNS MUST BE IN ACCORDANCE WITH BS 6798
1. IntERnAL to SInk WAStE
uPStREAm of SInk WAStE tRAP
2. IntERnAL ConnECtIon to SoIL AnD VEnt StACk
* Make connection to SVP using a solvent welded saddle
3. tERmInAtIon to SoAk AWAy
External
wall
BOILER
cla7774
EVOMAX -
Installation & Servicing
InStALLAtIon
BOILER
cla7771a
BOILER
esp8882
Termination
to Soak away
Ground Level
minimum
500mm
5. TERMINATION TO dRAIN / GUlly
External
wall
BOILER
cla7775
Open end of pipe
direct into gulley
below grating but
above water level
Ground Level
DRAIN
Open end of pipe
direct into gulley
below grating but
above water level
Ground Level
DRAIN
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents