The Apply Profile screen appears. This screen shows the Grid Profile Status for each
microinverter. Initially the status for each unit is shown as un-set, soon followed by a status of
"propagating." After approximately 10 minutes, the status is "set."
This screen also allows you to generate a report to confirm that the microinverters have been set
with an updated grid profile.
15. Click View Device Profile Report.
The Device Profile Report screen appears.
16. Enter the site information in the window provided.
45
 2014 Enphase Energy Inc.
Envoy Installation and Operation
141-00011 Rev 05