Important Information; Preparation For Removal And Disassembly; Replacement Parts; Gaskets, Oil Seals And O-Rings - E-TON ATV6A 90 Service Manual

Atv
Table of Contents

Advertisement

IMPORTANT INFORMATION

IMPORTANT INFORMATION
PREPARATION FOR REMOVAL AND
DISASSEMBLY
1.Before removal and disassembly add, remove
all dirt, mud, dust and foreign material.
2. Use only the proper tools and cleaning
equipment.
3. When disassembling always keep mated
parts together. This includes gears, cylin-
ders, pistons and other parts that have been
"mated" through normal wear. Mated parts
must always be reused or replaced as an
assembly.
4. During disassembly, clean all of the parts
and place them in trays in the order of dis-
assembly. This will speed up assembly and
allow for the correct installation of all parts.
5. Keep all parts away from any source of fire.

REPLACEMENT PARTS

1. Use only genuine E-TON parts for all
replacements.

GASKETS, OIL SEALS AND O-RINGS

1. When overhauling the engine, replace all
gaskets, seals and O-rings. All gasket sur-
faces, oil seal lips and O-rings must be
cleaned.
2. During reassembly properly oil all mating
parts and bearings, and lubricate the oil
seal lips with grease.
1 - 2
GEN
INFO

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Viper 90

Table of Contents