Ac/Reserve Power And Data Cabling Overview - Toshiba DK14 Installation And Maintenance Manual

Strata dk digital business telephone solutions
Table of Contents

Advertisement

AC/Reserve Power and Data Cabling Overview

Figure 7-12
shows an overview of the AC power and data cabling for the DK424i. Detailed
illustrations of AC power strips and cords are on the following pages.
CHSUB672A
Cabinet 1
(base)
CHSUE672A
Cabinet 2
(expansion)
CHSUE672A
Cabinet 3
(expansion)
CHSUE672A
Cabinet 4
(expansion)
CHSUE672A
Cabinet 5
(expansion)
5046
Data Cable
(supplied with expansion cabinet)
Figure 7-12 Intercabinet Power/Data Cables
Strata DK I&M
5/00
Power Supply
BPSU672A
Motherboard
2
BATT
3
4
5
6
7
AC IN
BPSU672A
BATT
AC IN
BPSU672A
BATT
AC IN
BPSU672A
BATT
AC IN
BPSU672A
BATT
AC IN
Step 4: Install AC Power Components
7 BBTC2A-2M battery cables
supplied with BBDB
Power supply cord for:
• 120VAC - supplied
Power Strip
• RPSB2 for
120VAC only
Battery Distribution Box
• BBDB
Power Strip Cables
to Primary AC Power outlets
(9 ft.)
BBTC1A-2M Cables
to Reserve Power Batteries
(2 m.)
DK424i Installation
7-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dk40iDk424Dk424i

Table of Contents