Package Checklist The Moxa PowerTrans switch is shipped with the following items. If any of these items are missing or damaged, please contact your customer service representative for assistance. 1 Moxa PowerTrans Switch Hardware Installation Guide CD-ROM with User’s Manual and SNMP MIB file...
Use four screws to attach the PT switch to a standard rack. Use four screws to attach the PT switch to a standard rack. Wall Mounting Use four screws to attach the PT switch to a Moxa wall mounting kit. Wiring Requirements WARNING Safety First! Be sure to disconnect the power cord before installing and/or wiring your Moxa PowerTrans Switch.
Wiring the Power Inputs The PT series of switches supports dual redundant power supplies (DC power only): VDC “Power Supply 1 (PWR1)” and “Power Supply 2 (PWR2)”, or VAC “Power Supply (PWR1)”. The connections for PWR1, PWR2 and the RELAY are located on the terminal block. The front view of the terminal block connectors are shown below.
LED Indicators The front panel of the PT switch contains several LED indicators. The function of each LED is described in the table below. Color State Description System LEDs System has passed self-diagnosis test on boot-up and is ready to run. GREEN System is undergoing the Blinking...
port’s link is active. The corresponding module port’s data is being Blinking transmitted. The corresponding module port’s link is inactive. The corresponding module port’s data is being transmitted at 10 Mbps. The corresponding module port’s data is being transmitted at 100 GREEN SPEED Mbps.
Page 8
Road Traffic NEMA TS2 Rail Traffic EN50121-4 FCC Part 15, CISPR (EN55022) class A 5 years Warranty Technical Support Contact Information www.moxa.com/support Moxa Americas: Moxa China (Shanghai office): Toll-free: 1-888-669-2872 Toll-free: 800-820-5036 Tel: +1-714-528-6777 Tel: +86-21-5258-9955 Fax: +1-714-528-6778 Fax: +86-10-5258-5505...
Need help?
Do you have a question about the PowerTrans PT-7710 Series and is the answer not in the manual?
Questions and answers