Service Access - Maytag STACKED WASHER- DRYER Installation Instructions Manual

Stacked washer- dryer
Table of Contents

Advertisement

240EdwardsStre_:,SE
C_evefand. Tennessee _731 T
Tel:422-472-,7,33S
Fax: 4 23-478-67 _3
MAKE - UP AIR
For proper operation of the dryer unit, it is important to make sure the location has adequate
make-up air. This is especially important in any confined area such as a bathroom or closet.
There must be at least two 36 inch square unobstructed openings for intake air. This can be a
louvered door or other equivalent opening.
On gas dryer units in particular, adequate clearance as noted on the dryer minimum clearance
label should be maintained to insure enough air for combustion and proper operation of the
dryer. The area where located must not obstruct the flow of combustion or ventilating air.
When installing a Maytag Stacked Washer/Dryer the following minimum clearances to com-
bustible surfaces must be maintained; clearance to wall and sides, 0 inches, top, 6 inches,
front I/2 inch to washer, rear 0 inches with an outside exhaust, 4 inches with an inside
exhaust (not recommended). See Exhausting Section and Installation Accessories for exhaust
kits.
SERVICE ACCESS
Location should allow access to the foot at the unit for washer and dryer service. Access
must be available to two screws at the top front corners of the dryer front panel (on the top).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lde7804

Table of Contents