Maytag STACKED WASHER/DRYER Installation Instructions Manual
Maytag STACKED WASHER/DRYER Installation Instructions Manual

Maytag STACKED WASHER/DRYER Installation Instructions Manual

Stacked washer/dryer factory stacked version
Hide thumbs Also See for STACKED WASHER/DRYER:

Advertisement

STACKED WASHER / DRYER

INSTALLATION INSTRUCTIONS

FACTORY STACKED VERSION
The installation, including a proper exhaust system, is the responsibility of the owner.
LEAVE THESE INSTRUCTIONS WITH THE OWNER
For further information, call 1-888-4-MAYTAG (1-888-462-9824).
6 2721750
Printed in U.S.A.

Advertisement

Table of Contents
loading

Summary of Contents for Maytag STACKED WASHER/DRYER

  • Page 1: Installation Instructions

    STACKED WASHER / DRYER INSTALLATION INSTRUCTIONS FACTORY STACKED VERSION The installation, including a proper exhaust system, is the responsibility of the owner. LEAVE THESE INSTRUCTIONS WITH THE OWNER For further information, call 1-888-4-MAYTAG (1-888-462-9824). 6 2721750 Printed in U.S.A.
  • Page 2: Tools Needed For Installation

    Read this before you start… TOOLS needed for installation Teflon tape or pipe joint Screw driver (standard) compound (gas) Duct tape Cutting knife Crescent wrench Pipe wrench (gas) 3/8” nut driver 5/16” nut driver (electric – U.S. only) Level ITEMS PROVIDED Electric Washer/ Dryer Only Make sure you have everything necessary for proper installation.
  • Page 3 PLEASE READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE STARTING TO INSTALL THE DRYER. THESE INSTRUCTIONS SHOULD BE RETAINED FOR FUTURE REFERENCE. FOR GAS DRYERS THE INSTALLATION MUST CONFORM WITH THE NATIONAL FUEL GAS CODE ANSI Z223.1, LATEST REVISION. ANY QUESTIONS CONCERNING THIS SHOULD BE REFERRED TO THE LOCAL GAS UTILITY.
  • Page 4 Exhaust Hood Type Number 90° Turns 4” 2-1/2” Maximum length of 4-inch diameter rigid metal duct 65 ft. 59 ft. 54 ft. 48 ft. 44 ft. 38 ft. 36 ft. 30 ft. 28 ft. 22 ft. Maximum length of 4-inch diameter flexible stiff walled metal duct 36 ft.
  • Page 5: Drain Facility

    WASHER REQUIREMENTS Water pressure of 20 to 120 p.s.i. is required to correctly fill the washer to the proper levels. DRAIN FACILITY Recommended height of the stand pipe is 36 inches. If the stand pipe is less than 36 inches high, the drain hose should be routed through the clip to raise the hose to the proper height.
  • Page 6: Gas Requirements

    GAS REQUIREMENTS Use only Natural or LP (liquid propane) gases. THE INSTALLATION MUST CONFORM WITH LOCAL CODES, OR IN THE ABSENCE OF LOCAL CODES, WITH THE NATIONAL FUEL GAS CODE ANSI/Z223.1, LATEST REVISION (FOR THE UNITED STATES), OR WITH THE CAN/CGA-B149 INSTALLATION CODES (FOR CANADA). A gas dryer is equipped with a burner orifice for operation on NATURAL gas.
  • Page 7: Electrical Requirements

    ELECTRICAL REQUIREMENTS WARNING – To prevent WARNING unnecessary risk of fire, NOTE: Wiring diagram is located inside the access panel. electrical shock or personal injury, all wiring Export models (not U.S. or Canada): and grounding must be done in accordance See Additional Instructions for Export Models on the following with local codes, with pages.
  • Page 8 Illinois USA 60631, 773-714-0100, for information on product, shipping damage, replacement parts and accessories. Maytag models manufactured for operation on 60 Hz AC are not designed for use on 50 Hz AC electrical service and conversion of the product from 60 to 50 Hz operation is not recommended. For additional information on 50 Hz products, contact Maytag International.
  • Page 9: Additional Information

    ADDITIONAL INFORMATION REPLACEMENT PARTS AND ACCESSORIES If the dryer requires replacement parts or accessories, contact your local Maytag dealer from whom you purchased your appliance or: Maytag Customer Service 240 Edwards Street, S.E. Cleveland, Tennessee 37311 Phone 1-888-4-MAYTAG (1-888-462-9824), for information on the nearest authorized Maytag Parts Distribu- tor.
  • Page 10 To install… Carefully remove any packaging materials from the outside of the appliance. Set aside two corner posts for installation. IMPORTANT: Notice that the hoses are tied up with a shipping strap. (See figure 1.) The strap should not be cut or removed until the machine is ready to be installed.
  • Page 11 HOSE Remove hose from the drain hose clip. RETAINER Place the drain hose in the drain facility. To change drain hose direction or prevent hose from collapsing or becoming damaged, turn the end of the hose while holding the base of the hose stationary. (See figure 8.) To prevent accidental dislodging secure the drain hose to the standpipe, inlet hose or laundry tub with the tie strap provided in the parts package.
  • Page 12 For gas dryers apply joint compound or about 1-1/2 wraps of Teflon tape over threaded connection on the end of the gas pipe. (See figure 11.) An elbow is recommended, for additional depth, pointing down to allow the unit to be located further back into the alcove. Note: Pipe joint compound must be resistant to the action of any liquefied petroleum gas.
  • Page 13 For electric dryers: TO MAKE ELECTRICAL CONNECTION FOR U.S. DRYERS Review electrical requirements on page 6 of these instructions. IMPORTANT – All U.S. models are produced for a 3-WIRE SYSTEM CONNECTION. The dryer frame is grounded to the Terminal Block neutral conductor at the terminal block.
  • Page 14 2-WIRE AND GROUND SYSTEM 2-Wire and Ground System CONNECTIONS Remove the terminal block cover plate. Insert the power cord with an agency listed strain relief through the hole provided in the cabinet near the terminal block. Note, a strain relief must be Neutral Post used.
  • Page 15 Directions for reversing the dryer door: 1. Remove the hinge hole covers and screws. 2. While supporting the door, remove 4 screws in the hinges that secure the hinges to the cabinet and set the door down. 3. Move the following parts to the opposite side of the door: 2 hinges and 4 hinge screws, 4 door screws, door strike and screw, inner door cover plate and screw.
  • Page 16: Final Installation Checklist

    FINAL INSTALLATION CHECK LIST Instruction and Installation Kits have been removed. Shipping straps have been removed. Appliance is level with all legs firmly on the floor, with the lock nuts tightened against the base. Drain hose is properly located into drain facility, snapped into drain hose retainer and is not kinked. Gas Models –...
  • Page 17: Installation Accessories

    INSTALLATION ACCESSORIES • Vent hood – 4” (10.16cm) opening – 059129 • Aluminum pipe – 4” x 24” (10.16cm x 60.96cm) – 059130 • Aluminum elbow – 4” (10.16cm) – 059131 • Aluminum window plate – 15” x 20” (38.10cm x 50.80cm) – 4” (10.16cm) hole – 059134 •...

Table of Contents