Ventilation And Clearance; Leveling Procedures - Taylor QS12 Operating Instructions Manual

Hide thumbs Also See for QS12:
Table of Contents

Advertisement

Ventilation and Clearance

To ensure proper operation of this appliance it must be
installed so that the products of combustion are
efficiently removed. Do not store anything on top of the
grill.
Most service can be performed from the front of the
grill. When inspecting heating elements, the unit must
be disconnected and pulled out of the hood enclosure.
Allow four feet in front of the appliance for this purpose.

Leveling Procedures

Figure 2
Step 1
The leveling adjustment needs to be performed while
the grill is at operating temperature. Remove the cook
surface shroud and release sheet.
Step 2
To allow adjustment of the gap pins, loosen the two set
screws located on the side of the front and rear gap
slide.
Figure 3
2
To the Installer
Models QS12 & QS24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qs24

Table of Contents