Section 1: Landing Gear Installation - Hangar 9 Assembly Manual

Hide thumbs Also See for Hangar 9:
Table of Contents

Advertisement

Section 1: Landing Gear Installation

Required Parts
• Fuselage
• Main landing gear assembly (2)
• 3mm x 12mm sheet metal screw (4)
Required Tools and Adhesives
• Phillips screwdriver: #2
o
Step 1
Locate one of the landing gear assemblies. Insert the end
of the wire into the hole in the fuselage.
o
Step 2
Press the landing gear into the notch on the bottom of the
fuselage so it is flush with the bottom of the fuselage.
8
• Landing gear strap (2)
Step 3
Repeat Steps 1 and 2 to install the remaining landing
gear assembly.

Step 4
Locate one of the landing gear straps. The strap will be
used to secure the main gear to the fuselage. Holes have
been pre-drilled for the screws that secure the landing
gear strap in position.
Note: Before installing the screws, apply
2–3 drops of thin CA into each of the holes
to harden the surrounding wood. This will
allow the screws to be more secure and will
help in preventing them from vibrating loose.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alpha 40 with spektrum dx5e

Table of Contents