3. INSTALLATION

3.3 External Battery Pack

The CFR is designed so that battery backup time can be greatly
extended simply by plugging the EBP 24 External Battery Pack into the back
of the UPS. Battery packs are completely self-contained.
Unit
EBP 24A
EBP 24C 66 Ah
EBP 24E
*Battery run times are calculated at typical load (80%) and represent the total time of the CFR internal
batteries and EBP battery pack.
1. Switch the CFR's BATTERY circuit breaker OFF.
2. Locate the EXTERNAL battery connector on the rear panel of the UPS
and remove the Phillips screw #1 and loosen Phillips screw #2.
3. Slide the cover plate to the left and insert the battery pack's connector
into the UPS. Secure the connector to the UPS using the Phillips screw
#1.
4. Switch the EBP and CFR "BATTERY" breakers ON and test the unit
for proper operation.
BATTERY
Circuit Breaker
Rating
Voltage
17 Ah
24 VDC
24 VDC
176 Ah
24 VDC
Phillips Screwdriver
Figure 7
CFR 600 and EBP External Battery Pack
Run Time*
CFR 600
CFR 600XT CFR 1000
0.66 hrs
1 hrs
3.75 hrs
4.3 hrs
8.5 hrs
9.0 hrs
Requires
Note: Battery Pack
can be installed along
side, or underneath
the CFR UPS.
18
0.5 hrs
2.1 hrs
5.0 hrs
Phillips Screw # 2
Phillips Screw #1
External Battery
Connector